mirror of
https://gitlab.torproject.org/tpo/core/tor.git
synced 2024-11-27 22:03:31 +01:00
Merge branch 'bug26121-033-squashed' into maint-0.3.3
This commit is contained in:
commit
f15f90e2ca
6
changes/bug26121
Normal file
6
changes/bug26121
Normal file
@ -0,0 +1,6 @@
|
||||
o Minor bugfixes (controller):
|
||||
- Improve accuracy of the BUILDTIMEOUT_SET control port event's
|
||||
TIMEOUT_RATE and CLOSE_RATE fields. (We were previously miscounting
|
||||
the total number of circuits for these field values.) Fixes bug
|
||||
26121; bugfix on 0.3.3.1-alpha.
|
||||
|
@ -1908,13 +1908,20 @@ cbt_control_event_buildtimeout_set(const circuit_build_times_t *cbt,
|
||||
|
||||
/* The timeout rate is the ratio of the timeout count over
|
||||
* the total number of circuits attempted. The total number of
|
||||
* circuits is (timeouts+succeeded+closed), since a circuit can
|
||||
* either timeout, close, or succeed. We cast the denominator
|
||||
* circuits is (timeouts+succeeded), since every circuit
|
||||
* either succeeds, or times out. "Closed" circuits are
|
||||
* MEASURE_TIMEOUT circuits whose measurement period expired.
|
||||
* All MEASURE_TIMEOUT circuits are counted in the timeouts stat
|
||||
* before transitioning to MEASURE_TIMEOUT (in
|
||||
* circuit_build_times_mark_circ_as_measurement_only()).
|
||||
* MEASURE_TIMEOUT circuits that succeed are *not* counted as
|
||||
* "succeeded". See circuit_build_times_handle_completed_hop().
|
||||
*
|
||||
* We cast the denominator
|
||||
* to promote it to double before the addition, to avoid int32
|
||||
* overflow. */
|
||||
const double total_circuits =
|
||||
((double)cbt->num_circ_timeouts) + cbt->num_circ_succeeded
|
||||
+ cbt->num_circ_closed;
|
||||
((double)cbt->num_circ_timeouts) + cbt->num_circ_succeeded;
|
||||
if (total_circuits >= 1.0) {
|
||||
timeout_rate = cbt->num_circ_timeouts / total_circuits;
|
||||
close_rate = cbt->num_circ_closed / total_circuits;
|
||||
|
Loading…
Reference in New Issue
Block a user